2012
The construction of two new Transnet railway lines adjacent to an existing line encountered subsoil drainage problems and space limitations. A blanket drain with a lateral fin drain were specified instead of a sand blanket drain. The latter proved problematic as the sand layer was easily contaminated by the fill and the thickness was difficult to […]