Durban Harbour Widening 2010

Durban Harbour Widening, 2010

2010

bidim A10 was supplied as erosion protection of the new earth embankment and as a separation layer between the earth embankment and the stone faced armoring that was installed around this earth embankment.

Langebaan Lagoon 2002

Langebaan Lagoon, 2002

2002

bidim® A6 exhibits such properties to maintain the integrity of the breakwater berm in such harsh, dynamic flow conditions pertaining to the site

DSC00007

Umhlanga Rocks, 2002

2002

A system of 12 Geo Steps of bidim A4 wrap-around check weirs were constructed to halt further stormwater erosion leading up to the land development programme.