Deprecated: __autoload() is deprecated, use spl_autoload_register() instead in /home/bidim/public_html/wp-includes/compat.php on line 502

Deprecated: Function get_magic_quotes_gpc() is deprecated in /home/bidim/public_html/wp-includes/load.php on line 649

Notice: Trying to access array offset on value of type bool in /home/bidim/public_html/wp-includes/theme.php on line 2241

Deprecated: Function get_magic_quotes_gpc() is deprecated in /home/bidim/public_html/wp-includes/formatting.php on line 4365

Warning: Cannot modify header information - headers already sent by (output started at /home/bidim/public_html/wp-includes/compat.php:502) in /home/bidim/public_html/wp-includes/feed-rss2.php on line 8
rail – bidim® http://www.bidim.co.za The original since 1971 Tue, 09 May 2017 09:10:55 +0000 en-US hourly 1 https://wordpress.org/?v=4.7.28 Transnet Ermelo, 2012 http://www.bidim.co.za/transnet-ermelo-2012/ http://www.bidim.co.za/transnet-ermelo-2012/#respond Sun, 05 Aug 2012 09:50:46 +0000 http://www.bidim.co.za/?p=130 The construction of two new Transnet railway lines adjacent to an existing line encountered subsoil drainage problems and space limitations. A blanket drain with a lateral fin drain were specified instead of a sand blanket drain.  The latter proved problematic as the sand layer was easily contaminated by the fill and the thickness was difficult to control under heavy traffic.

bidim A10 was used as the drainage and separation  layer as it maintains the integrity of selected fill material over very low CBR subgrades, whilst allowing the dissipation of pore water pressure within its plane resulting in rapid stabilisation.

bidim_recycle_big
The bidim used in this project was produced using
over 286 000 recycled cooldrink bottles.

]]>
http://www.bidim.co.za/transnet-ermelo-2012/feed/ 0