N5 Harrismith to Kestell, 2013

By kaytech marketing, 2013

Severe deterioration of the N5 between Harrismith and Kestell meant rehabilitation was essential. Adequate drainage of base layers can extend the life of the new road and so subsoil drainage alongside the constructed road was critical to ensure the water table was drawn down below the layer works.