Dropping the road level at this off-ramp for noise and safety reasons meant that ground water levels had to be adjusted for. A 400mm x 400mm conventional stone drain wrapped in bidim A4 was installed on both sides of the new proposed road as well as the on and off ramps to the town.
What do you think?