Deprecated: __autoload() is deprecated, use spl_autoload_register() instead in /home/bidim/public_html/wp-includes/compat.php on line 502
Deprecated: Function get_magic_quotes_gpc() is deprecated in /home/bidim/public_html/wp-includes/load.php on line 649
Notice: Trying to access array offset on value of type bool in /home/bidim/public_html/wp-includes/theme.php on line 2241
Deprecated: Function get_magic_quotes_gpc() is deprecated in /home/bidim/public_html/wp-includes/formatting.php on line 4365
Warning: Cannot modify header information - headers already sent by (output started at /home/bidim/public_html/wp-includes/compat.php:502) in /home/bidim/public_html/wp-includes/feed-rss2.php on line 8 Hydraulic Construction – bidim®
http://www.bidim.co.za
The original since 1971Tue, 09 May 2017 09:10:55 +0000en-UShourly1https://wordpress.org/?v=4.7.28Quoin Rock Stellenbosch, 2014
http://www.bidim.co.za/quoin-rock-stellenbosch-2014/
http://www.bidim.co.za/quoin-rock-stellenbosch-2014/#respondMon, 04 Aug 2014 14:38:45 +0000http://www.bidim.co.za/?p=109To protect against erosion and wave action, bidim A8 was placed underneath the rip rap.
The bidim used in this project was produced using
over 707 000 recycled cooldrink bottles.
]]>http://www.bidim.co.za/quoin-rock-stellenbosch-2014/feed/0Sunday River Bridge 2011
http://www.bidim.co.za/sunday-river-bridge-2011/
http://www.bidim.co.za/sunday-river-bridge-2011/#respondFri, 05 Aug 2011 11:44:50 +0000http://www.bidim.co.za/?p=142In order to carry out repairs on the bridge, a temporary construction platform was created with dune sand. With the velocity of the water, the sand was kept in place using glazed geocontainers of bidim A6 and the platforms supported the entire 17 month construction.
]]>http://www.bidim.co.za/sunday-river-bridge-2011/feed/0ArcelorMittal Vanderbijlpark, 2011
http://www.bidim.co.za/arcelormittal-vanderbijlpark-2011/
http://www.bidim.co.za/arcelormittal-vanderbijlpark-2011/#respondThu, 04 Aug 2011 09:16:42 +0000http://www.bidim.co.za/?p=47bidim A4 was laid below and over the HDPE layer as liner protection of the capping of this waste facility. It was also used as part of a riprap system in the storm water drainage canals.
]]>http://www.bidim.co.za/arcelormittal-vanderbijlpark-2011/feed/0Durban Harbour T Jetty, 2003
http://www.bidim.co.za/durban-harbour-t-jetty-2003/
http://www.bidim.co.za/durban-harbour-t-jetty-2003/#respondWed, 06 Aug 2003 11:41:24 +0000http://www.bidim.co.za/?p=199A bidim A6 sock barrier was used between the caissons to prevent leakage of the sand fill behind the caissons from leaching out of the reclaimed area and into the harbour
]]>http://www.bidim.co.za/durban-harbour-t-jetty-2003/feed/0Booth Road Canal Durban, 1999
http://www.bidim.co.za/booth-road-canal-durban-1999/
http://www.bidim.co.za/booth-road-canal-durban-1999/#respondFri, 06 Aug 1999 12:00:17 +0000http://www.bidim.co.za/?p=208bidim placed below the reno mattresses prevents scour and does not allow the build up of excessive pore water pressure.
]]>http://www.bidim.co.za/booth-road-canal-durban-1999/feed/0