Deprecated: __autoload() is deprecated, use spl_autoload_register() instead in /home/bidim/public_html/wp-includes/compat.php on line 502

Deprecated: Function get_magic_quotes_gpc() is deprecated in /home/bidim/public_html/wp-includes/load.php on line 649

Notice: Trying to access array offset on value of type bool in /home/bidim/public_html/wp-includes/theme.php on line 2241

Deprecated: Function get_magic_quotes_gpc() is deprecated in /home/bidim/public_html/wp-includes/formatting.php on line 4365

Warning: Cannot modify header information - headers already sent by (output started at /home/bidim/public_html/wp-includes/compat.php:502) in /home/bidim/public_html/wp-includes/feed-rss2.php on line 8
Hydraulic Construction – bidim® http://www.bidim.co.za The original since 1971 Tue, 09 May 2017 09:10:55 +0000 en-US hourly 1 https://wordpress.org/?v=4.7.28 Quoin Rock Stellenbosch, 2014 http://www.bidim.co.za/quoin-rock-stellenbosch-2014/ http://www.bidim.co.za/quoin-rock-stellenbosch-2014/#respond Mon, 04 Aug 2014 14:38:45 +0000 http://www.bidim.co.za/?p=109 To protect against erosion and wave action, bidim A8 was placed underneath the rip rap.

bidim_recycle_big
The bidim used in this project was produced using
over 707 000 recycled cooldrink bottles.

]]>
http://www.bidim.co.za/quoin-rock-stellenbosch-2014/feed/ 0
Sunday River Bridge 2011 http://www.bidim.co.za/sunday-river-bridge-2011/ http://www.bidim.co.za/sunday-river-bridge-2011/#respond Fri, 05 Aug 2011 11:44:50 +0000 http://www.bidim.co.za/?p=142 In order to carry out repairs on the bridge, a temporary construction platform was created with dune sand.  With the velocity of the water, the sand was kept in place using glazed geocontainers of bidim A6 and the platforms supported the entire 17 month construction.

]]>
http://www.bidim.co.za/sunday-river-bridge-2011/feed/ 0
ArcelorMittal Vanderbijlpark, 2011 http://www.bidim.co.za/arcelormittal-vanderbijlpark-2011/ http://www.bidim.co.za/arcelormittal-vanderbijlpark-2011/#respond Thu, 04 Aug 2011 09:16:42 +0000 http://www.bidim.co.za/?p=47 bidim A4 was laid below and over the HDPE layer as liner protection of the capping of this waste facility.  It was also used as part of a riprap system in the storm water drainage canals.

]]>
http://www.bidim.co.za/arcelormittal-vanderbijlpark-2011/feed/ 0
Durban Harbour T Jetty, 2003 http://www.bidim.co.za/durban-harbour-t-jetty-2003/ http://www.bidim.co.za/durban-harbour-t-jetty-2003/#respond Wed, 06 Aug 2003 11:41:24 +0000 http://www.bidim.co.za/?p=199 A bidim A6 sock barrier was used between the caissons to prevent leakage of the sand fill behind the caissons from leaching out of the reclaimed area and into the harbour

]]>
http://www.bidim.co.za/durban-harbour-t-jetty-2003/feed/ 0
Booth Road Canal Durban, 1999 http://www.bidim.co.za/booth-road-canal-durban-1999/ http://www.bidim.co.za/booth-road-canal-durban-1999/#respond Fri, 06 Aug 1999 12:00:17 +0000 http://www.bidim.co.za/?p=208 bidim placed below the reno mattresses prevents scour and does not allow the build up of excessive pore water pressure.

]]>
http://www.bidim.co.za/booth-road-canal-durban-1999/feed/ 0