The bidim in this project used the equivalent of
201 318 recycled cooldrink bottles.
The water table needed to be lowered for the basement layer where bidim was used in drainage trenches and as a separation layer between the in situ and aggregate at the base of the surface bed.
The bidim used in this project was produced using
214 000 recycled cooldrink bottles.
The bidim in this project used the equivalent of
12 132 recycled cooldrink bottles.
The bidim used in this project was produced using
49 232 recycled cooldrink bottles.
The bidim in this project used the equivalent of
80 081 recycled cooldrink bottles.
The bidim in this project used the equivalent of
3 978 recycled cooldrink bottles.
Installed subsoil drains using bidim A4 in the median, drains the water in this area to stop the ingress of water and protect the layer works. The water collected by the subsoil drain is tapped off into storm water drains in the median.
The bidim in this project used the equivalent of
over 528 000 recycled cooldrink bottles.